F2 · London, ON

Medium-hazard industrial in London: what the code requires

What binds a medium-hazard industrial (f2) building in London?

In London, the binding requirement for a medium-hazard industrial building is that suppression and separations match the actual storage or process hazard — not the hazard the building was permitted for.

Systems required

7

typical 2-storey, 20k sf profile

Full-retrofit capex

$202,716–$710,100

if nothing is in place

Occupant load basis

F2

class

Code in force

ON

2024 Ontario Building Code (O. Reg. 163/24)

Run your building, not the typical one

Pre-filled for a medium-hazard industrial (f2) building in London. Change the storeys, area and systems in place to get your own gap list and memo.

Systems already in place

Set the occupancy, size and systems on the left. The generator returns the required systems with code citations, the gap list with capex bands, and a printable scope memo.

What inspectors fail medium-hazard industrial (f2) buildings on

  • Process changes that outgrew the original sprinkler density
  • Fire separations breached by new conveyors and ducting
  • Hot-work performed without a permit routine
  • Extinguisher classes mismatched to the current hazard

Manufacturing and processing with a moderate combustible load. Sprinkler demand and fire separations tighten relative to F3. In London, these buildings are read against the 2024 Ontario Building Code (O. Reg. 163/24), in force since 2025-01-01, with maintenance enforced under the Ontario Fire Code (O. Reg. 213/07, as amended).

The occupant load is the number everything else hangs on. NBC 2020 Div. B Table 3.1.17.1 — industrial, 4.6 m² per person. Once the load is known, the code sets the exit count, the egress width, and whether the alarm and sprinkler triggers fire. An owner who guesses the load guesses the whole scope.

What inspectors actually fail medium-hazard industrial (f2) buildings on in Ontario is consistent: process changes that outgrew the original sprinkler density; fire separations breached by new conveyors and ducting; hot-work performed without a permit routine. The pattern matters because most of it is maintenance discipline, not capital — but the items that are capital, like suppression matched to the wrong hazard, are the expensive surprises.

Budgeting should use region-adjusted bands. Securlor models Ontario at 108% of the national baseline; a sprinkler retrofit that prices at $8 per square foot nationally models near $8 here. Sequence the scope: life-safety gaps that block occupancy or insurance first, monitoring contracts second, elective hardening last.

This page is a planning scope. The authority having jurisdiction in London — not this site — decides what binds a specific building, and a qualified professional must confirm the requirement set against the adopted edition.

Planning scope This is a planning scope, not a code compliance opinion. Code interpretation is jurisdictional and enforced by the authority having jurisdiction — a municipal official, not this site. Confirm every requirement against the adopted code edition with a qualified professional before you design, budget or build.

How these figures were produced

  • ObservedRecorded directly from the cited source series, unadjusted.
  • ModelledDerived arithmetically from observed inputs using the published method; not a market quote.
How Securlor computes these numbers

Sources

  1. [1] 2024 Ontario Building Code (O. Reg. 163/24)requirement framework for Ontario
  2. [2] Ontario Fire Code (O. Reg. 213/07, as amended)maintenance and inspection duties
  3. [3] Securlor modelled cost seriesnational baseline, region-adjusted
How Securlor computes these numbers

What life-safety systems does a Medium-hazard industrial (F2) building need in London?

Run the scope generator above with your storeys, floor area and existing systems — it returns the required list with the code clause for each. The requirement set depends on occupant load and building height, not just the occupancy class.

How is occupant load calculated for a Medium-hazard industrial (F2) building?

NBC 2020 Div. B Table 3.1.17.1 — industrial, 4.6 m² per person.

Which code edition applies in London?

The 2024 Ontario Building Code (O. Reg. 163/24), with maintenance under the Ontario Fire Code (O. Reg. 213/07, as amended). In force since 2025-01-01.

Is this a code compliance opinion?

No. It is a planning scope assembled from the published model code. The authority having jurisdiction governs, and a code consultant or fire protection engineer must confirm the scope before you act on it.

The scope above wrote its compliance capex into your deal file. Carry it to a sister site to price the rest of the transaction, or read the London market page for the full code picture.

Not adviceSecurlor is a data publisher. Nothing here is professional, financial, legal, or investment advice, and nothing here is an offer or a quote. Figures are indicative benchmarks for comparison and must be confirmed with a qualified professional before you rely on them. About Securlor